The concrete waterproofing benefits
provided by Xypex® products have
been integral to architectural
planning in projects around
the world. Architects who have
specified it know that Xypex
makes concrete even better.
Now, you can experience
the same benefits!
Home
About
Contact
Leaky Basements
How Xypex Works
Do It Yourself
Xypex Advantages
Ask an Expert
Online Store
Do It Yourself

If concrete walls and floors are moist or wet due to water seepage through the pores of the concrete, then a product like Xypex® Concentrate can simply be applied with a brush to the concrete surfaces. However, if water seepage is occurring through construction joints (for example, where the floor and walls meet), cracks or other defects, then these areas must be repaired prior to applying the Xypex® coating.

For crack repairs, you will need approximately 1 lb. of Xypex® Concentrate and 1 lb. of Xypex® Patch'n Plug for every linear foot of crack. For surface applications, you will need approximately 1 lb. of Xypex® Concentrate for every six square feet.
Click here for product purchase in our Online Store.

Waterproofing Cracks and Joints

1. Chisel or chip out a rectangular "U" shaped groove (not "V" shaped) along crack or construction joint. For best results, groove should be approximately 1" wide by 1½" deep.

2. Remove all loose debris from groove by flushing with water and scrubbing with a stiff bristle brush.

3. Fill groove with Xypex® Patch'n Plug or other fast-setting hydraulic cement compound available at building supply stores. To enhance its waterproofing characteristics, blend 3 parts hydraulic cement with 1 part Xypex® Concentrate.

4. Apply Xypex® coating over the repaired area and to the concrete surface in accordance with directions below.


Brush Application of Xypex®

Once leaky cracks and construction joints have been repaired, the waterproofing of walls and/or floor can be undertaken by applying a slurry coat of Xypex® to the concrete surface. To ensure best possible results, follow the application instructions carefully (detailed application procedures can also be found inside the container). Coverage for one coat is approximately 6 sq. ft. per lb.

1. Surface Preparation
A clean, open-pore surface is required. Remove any substance (e.g. dirt, oil, paint etc.) that could prevent the penetration of Xypex®'s crystalline growth deep within the pores and capillary tracts of the concrete or concrete block. Smooth steel-trowelled concrete (e.g. some floors) must be roughened or etched to provide proper "tooth and suction" for the Xypex® Concentrate treatment.



2. Wetting the Concrete
Moisture is also required for Xypex®'s chemical ingredients to penetrate and crystallize deep within the pores of the concrete. Therefore, dry concrete must be thoroughly saturated (soaked) with clean water before application of the Xypex® coating. This can be accomplished by spraying with a hose or garden sprayer, or by filling a pail with water and brushing the water onto the concrete surface. Excess surface water should be removed prior to application.


3. Mixing
Mix 5 parts Xypex® powder with 2 parts clean water (by volume) until a thick creamy consistency is obtained (a paddle mixer on a slow speed drill may be used for larger batches). Mix only as much as can be applied in 10-15 minutes. If mix starts to set, agitate briefly but do not add more water. Protect hands with rubber gloves.



4. Application
Apply slurry mixture with a thick nylon bristle brush (cement brush) or push broom for large horizontal surfaces. The mixture must be uniformly applied and should have a thickness of 1/16" (1.25 mm). When a second coat is required (e.g. concrete block walls), it should be applied after the first coat has set but is still "green" (less than 48 hours). Spraying a light mist between coats may be necessary to prevent premature drying. Xypex® cannot be applied outdoors in rain or freezing weather.


5. Curing
The curing process is important for the growth of the crystalline formation and proper hardening of the coating. Curing should begin after the coating reaches an initial set and begins to dry (normally 1-2 hours). Cure by spraying the coating with a fine mist of water or apply water from a pail with an applicator brush. Under most conditions it is sufficient to dampen the Xypex® treatment three to four times a day for 2-3 days.
Care must be taken to prevent puddling of water over the Xypex® application on floor applications. In cool, damp conditions, water curing of the coating may not be necessary. In hot dry conditions the treatment will need to be dampened more frequently to prevent premature drying.

Warranty

XYPEX CHEMICAL CORPORATION warrants that the products manufactured by it shall be free from material defects and will be consistent with its normal high quality. Should any of the products be proven defective, the liability to XYPEX shall be limited to the replacement of the product ex factory. XYPEX MAKES NO WARRANTY AS TO THE MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE AND THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES EXPRESS OR IMPLIED. User shall determine the suitability of the products for their intended use and assume all risks and liability in connection therewith.

 For questions about concrete waterproofing, send mail to webinfo@leakybasementsolved.com

 Copyright © Intermountain Waterproofing